The GBT Dynamic Scheduling System: A New Scheduling Paradigm |
Volume: |
411, Astronomical Data Analysis Software and Systems XVIII |
Page: |
147 |
Authors: |
O’Neil, K.; Balser, D.; Bignell, C.; Clark, M.; Condon, J.; McCarty, M.; Marganian, P.; Shelton, A.; Braatz, J.; Harnett, J.; Maddalena, R.; Mello, M.; Sessoms, E. |
Abstract: |
The Robert C. Byrd Green Bank Telescope (GBT) is implementing a new Dynamic Scheduling System (DSS) designed to maximize the observing efficiency of the telescope while ensuring that none of the flexibility and ease of use of the GBT is harmed and that the data quality of observations is not adversely affected. To accomplish this, the GBT DSS is implementing a dynamic scheduling system which schedules observers, rather than running scripts. The DSS works by breaking each project into one or more sessions which have associated observing criteria such as RA, Dec, and frequency. Potential observers may also enter dates when members of their team will not be available for either on-site or remote observing. The scheduling algorithm uses those data, along with the predicted weather, to determine the most efficient schedule for the GBT. The DSS provides all observers at least 24 hours notice of their upcoming observing. In the uncommon (< 20%) case where the actual weather does not match the predictions, a backup project, chosen from the database, is run instead. Here we give an overview of the GBT DSS project, including the ranking and scheduling algorithms for the sessions, the scheduling probabilities generation, the web framework for the system, and an overview of the results from the beta testing which were held from June – September, 2008. |
|
|
|
|